San José’s housing stock is largely post-war ranch homes on generous lots, which makes it one of the best cities in the Bay Area for backyard ADUs and garage conversions. We plan around what the city’s Planning, Building and Code Enforcement department actually checks: sewer lateral capacity, setbacks, ordinance-size trees and, in older neighborhoods like Naglee Park and Hanchett & Hester Park, conservation-area design review.
Every project includes a fixed construction price and one project manager who stays with you from design through final sign-off.
We handle every permit. Here's the short version of what San Jose typically requires for common projects:
Detached, attached and garage ADUs for rental income or extended family.
Turn an existing garage into a legal ADU, in-law suite or home office.
Add a private suite of up to 500 sq ft inside the home you already own.
From refreshes to estate kitchens, typically $60K to $250K+.
Walk-in showers, primary suites and accessible bathrooms.
Bedrooms, primary suites and guest houses that match your home.
Whole-house renovations planned from 4–5 months to 12+ months.
One team for design, city approvals and construction.
2026 ranges for planning purposes. Your fixed price follows a site visit.
Most San José ADUs we price in 2026 run about $150,000–$250,000 for a garage conversion and $275,000–$600,000 for a new detached unit, depending on size, utility trenching and finishes.
Simple remodel permits can be issued within days to a few weeks. ADUs and additions typically take 2–4 months including plan-check revisions, and state law requires a decision on a complete ADU application within 60 days.
Yes. State law allows a single-family lot to have both an ADU and a Junior ADU, so many San José owners pair a backyard unit with a JADU inside the main house.
We work citywide, including Willow Glen, Rose Garden, Cambrian, Almaden Valley, Evergreen, Berryessa, West San José and Blossom Valley.
Most San José kitchen remodels fall into three levels: about $60,000–$95,000 for a refresh, $95,000–$150,000 for a signature remodel with semi-custom cabinetry and layout changes, and $150,000–$250,000 or more for an estate-level custom kitchen, plus city permit fees.
Plans and permits typically take 8–14 weeks, and construction of a detached ADU usually takes 16–22 weeks once permits are issued, so most detached ADUs are finished in about 6–9 months. Garage conversions and JADUs are usually faster.
It depends on scope: remodeling select spaces such as the kitchen and bathrooms takes about 4–5 months, a comprehensive remodel with structural changes 6–8 months, and a complete home redesign 8–12 months or more.
Planning a project in San Jose? Tell us about your property and choose your project type. We’ll review your ideas and follow up within one business day to schedule a free consultation.
© 2026 All Rights Reserved to True Builders