Many East Palo Alto homes sit on lots well suited to a backyard ADU or garage conversion — a practical way to house family or earn rental income. Parts of the city are in FEMA flood hazard areas near San Francisquito Creek and the bay, which can require raised floors for new construction. We check your parcel’s flood status and utilities early and guide you through the City of East Palo Alto’s permit process.
You’ll get a fixed construction price and one project manager.
We handle every permit. Here's the short version of what East Palo Alto typically requires for common projects:
Detached, attached and garage ADUs for rental income or extended family.
Turn an existing garage into a legal ADU, in-law suite or home office.
Add a private suite of up to 500 sq ft inside the home you already own.
From quick refreshes to fully custom estate kitchens.
Walk-in showers, primary suites and accessible bathrooms.
Bedrooms, primary suites and guest houses that match your home.
Whole-house renovations planned from 4–5 months to 12+ months.
One team for design, city approvals and construction.
Every project gets a fixed construction price after a free site visit.
The type of ADU matters most: converting a garage usually costs far less than building a new detached unit. After that, size, utility trenching and the sewer connection, foundation and soil conditions, and finish level drive the price. Flood-zone requirements can add foundation costs, and we design for them from the start. We give you a fixed price after a free site visit.
Often, yes. State law limits when cities can deny permits to legalize older unpermitted ADUs, except for health and safety issues. We inspect the unit and outline the upgrades needed.
Some neighborhoods are. If yours is, new construction may need to be built above the base flood elevation, and we design and price for that from the start.
A Junior ADU inside the home or a garage conversion is usually the lowest-cost option, often a fraction of the cost of a new detached ADU.
Scope is the biggest factor. A same-layout refresh, a signature remodel with semi-custom cabinetry and layout changes, and an estate-level custom kitchen are very different projects. Moving plumbing, gas lines or walls, cabinetry and countertop selections, appliances and city permit fees also play a role. We give you a fixed price after a free site visit.
Construction for a single-room addition typically takes 3–4 months, and a primary suite addition 4–6 months, plus time up front for design, engineering and permits.
Planning a project in East Palo Alto? Tell us about your property and choose your project type. We’ll review your ideas and follow up within one business day to schedule a free consultation.