Detached, attached, garage-conversion and Junior ADUs, with feasibility, City of San José permits and construction under one contract.
The True Builders difference
In short: Most detached ADUs in San Jose take about 6-9 months from design to completion. State law requires the city to act on a complete ADU application within 60 days.
Design concept
Placed clear of the fence line and mature trees, with privacy for both homes.
Sewer, water and power are trenched from the main house and sized correctly.
A small deck and a stone path across the lawn give the ADU its own front door.
Illustrative design concept. Ask us about completed ADUs near you.
Why True Builders
Most San Jose neighborhoods are post-war single-story homes on generous lots, ideal for a backyard unit. What stalls an ADU is almost always found late: setbacks and easements, sewer lateral capacity, trenching distances, ordinance-size trees and hillside grading. We check all of it before design, so the plan you approve is the plan the city approves.
ADU types
Most private
A standalone home in your backyard with its own entry, kitchen, bath and outdoor space.
Ask about thisShares a wall
Built onto the main house with a separate entrance, sharing a wall but not a front door.
Ask about thisReuses a garage
Reuses an existing garage’s foundation, walls and roof, with no replacement parking.
Ask about thisInside the home
Up to 500 sq ft inside your home, with an efficiency kitchen and its own entrance.
Ask about thisWhat’s included
Zoning, setbacks, easements, trees and utility routes reviewed before design begins.
Floor plans and exteriors designed around your lot, your goals and your main home.
Structural, energy and utility plans, guided through City of San José plan check.
Sewer, water and electrical connections, including panel upgrades, planned and built.
Foundation, framing, roofing, systems and finishes, built by one accountable team.
Final inspection, walkthrough and close-out documents, ready to live in or to rent.
How it works
We walk your lot, check setbacks, easements, trees, slope and utility routes, and talk through the size and goals you have in mind.
We develop the floor plan, exterior and site plan with you, along with the structural and Title 24 energy calculations the city needs.
With design complete, you receive a fixed construction price and a schedule, with no surprise line items later.
We submit to the City of San José and answer plan-check comments. The city must act on a complete ADU application within 60 days.
Most detached ADUs take 16-22 weeks to build: foundation, framing, utilities and finishes, inspected at every stage.
60-second planner
Local know-how
Deep, tree-lined lots suit a detached ADU at the back of the property. We place it around mature trees and existing garages, and plan the utility trench from day one.
Wide single-story lots comfortably fit detached one- and two-bedroom ADUs with private yards, often with a short, straight utility run from the main house to the unit.
Near the Berryessa/North San Jose BART station, many lots are within half a mile of transit, so no ADU parking is required and more of the backyard stays usable.
Generous backyards make this one of the city’s best areas for a two-bedroom detached ADU, with room for a private patio and a separate path to its own front door.
Larger lots offer more placement options. Foothill properties may need grading and geotechnical review, which we plan into the design schedule from the very start.
HOAs can set reasonable rules but can’t ban ADUs under California law. Hillside lots get a site-specific grading plan, and we design to meet community standards.
State law guarantees room for at least an 800 sq ft ADU with 4‑foot side and rear setbacks. We confirm your lot’s envelope.
ADUs are approved against objective standards, with no public hearing. The city must act on a complete application in 60 days.
ADUs under 750 sq ft are exempt from impact fees; larger ones pay fees in proportion to the main home. Permit fees still apply.
Ordinance-size trees need a removal permit, the sewer lateral can shape placement, and foothill lots may need geotechnical review.
Client stories
We collaborated with True Builders to renovate two bathrooms in our home… What stood out was their offer to select finished materials for us, saving time and energy for a fixed fee.
Having Nathan as our project manager was an absolute blessing!… Nathan made communication a breeze, keeping us in the loop with progress updates throughout the entire project.
I am a designer in my profession and I am very much into the details… True Builders never stopped the work and continue with everything that is needed to make a progress.
FAQs
Free estimate
Tell us about your property and goals and we’ll reach out to schedule a free visit. You’ll leave knowing what your lot can hold, which ADU type fits it best and what to plan for next.
More in San JoseHome remodeling · Kitchen remodeling · Garage conversions · Home additions
Request your free estimate
No obligation. We’ll reach out to schedule your site visit.
© 2026 All Rights Reserved to True Builders