Sunnyvale

Home / Sunnyvale
Service area · Sunnyvale, CA

Remodel Your Sunnyvale Home with One Trusted Team.

Whether you own a mid-century Eichler, a ranch home in Cherry Chase or a bungalow near historic Murphy Avenue, True Builders designs, permits and builds remodels, additions and ADUs across Sunnyvale. Licensed (CSLB #1110631) and insured.
Mid-century modern Eichler-style home in Sunnyvale
Local Knowledge, Local Results

Why Sunnyvale HomeownersChoose True Builders.

Sunnyvale has one of the Bay Area’s largest concentrations of Eichler homes, and the city protects their character: Eichler neighborhoods have their own design guidelines, and some areas are zoned single-story only. That shapes what’s possible — a second-story addition may be off the table, while a rear addition, atrium-friendly kitchen remodel or backyard ADU fits well. We work through those rules with Sunnyvale’s Community Development Department before design is finalized.

Every project comes with a fixed construction price and a single project manager.

Renovated post-and-beam interior with an atrium garden
Recent Work

Projects Like Yours.

Sunnyvale Permits & Rules

What to Know Before You Build in Sunnyvale.

We handle every permit. Here's the short version of what Sunnyvale typically requires for common projects:

  • Eichler homes — Exterior changes are reviewed against Sunnyvale's Eichler design guidelines, which favor low-slope roofs, simple materials and privacy for neighbors.
  • Single-story areas — Some neighborhoods carry a single-story zoning designation that limits additions to one story. We check your parcel's zoning first.
  • ADUs — Approved ministerially under state law; detached ADUs must meet height limits and 4-foot side and rear setbacks.
  • Kitchen & bath remodels — Permits are needed for plumbing, electrical and structural changes, and most residential applications run through the city's One-Stop Permit Center.
  • Heritage housing — Homes in the Taaffe-Frances Heritage Housing District near downtown require added design review for exterior work.
SERVICES IN SUNNYVALE

Everything Your Sunnyvale Home Needs.

From ADUs and garage conversions to kitchens, bathrooms and additions, one licensed team handles design, permits and construction for Sunnyvale homeowners.

Typical Sunnyvale Project Timelines

  • Detached ADU: typically finished in 6–9 months
  • Room addition: 3–4 months of construction for one room, 4–6 months for a primary suite
  • Whole-home remodel: 4–5 months for select spaces up to 8–12+ months for a full redesign

Every project gets a fixed construction price after a free site visit.

How a Sunnyvale Project Works

  1. Free consultation & site visitWe review your goals, your lot and Sunnyvale zoning rules before anything is designed.
  2. Design & fixed pricePlans, engineering and a clear, fixed construction price before work begins.
  3. PermitsWe submit to the City of Sunnyvale and handle every plan-check comment for you.
  4. Build & final inspectionOne project manager from the first day on site through final sign-off.

Also Serving Homeowners Near Sunnyvale

SUNNYVALE FAQS

Local Questions, Answered.

It depends on your neighborhood. Some Sunnyvale Eichler areas are zoned single-story only, while others allow second stories with design review. We check your parcel before any design work.

The type of ADU matters most: converting a garage usually costs far less than building a new detached unit. After that, size, utility trenching and the sewer connection, foundation and soil conditions, and finish level drive the price. We give you a fixed price after a free site visit.

Often somewhat. Post-and-beam structure, radiant slab heating and walls of glass need specialized framing, insulation and HVAC solutions, which we plan and price up front.

Most kitchen remodels take 6–12 weeks of active construction depending on complexity, plus a few weeks beforehand for design, selections and permitting.

Scope is the biggest factor. A same-layout refresh, a signature remodel with semi-custom cabinetry and layout changes, and an estate-level custom kitchen are very different projects. Moving plumbing, gas lines or walls, cabinetry and countertop selections, appliances and city permit fees also play a role. We give you a fixed price after a free site visit.

Plans and permits typically take 8–14 weeks, and construction of a detached ADU usually takes 16–22 weeks once permits are issued, so most detached ADUs are finished in about 6–9 months. Garage conversions and JADUs are usually faster.

Ready to Start?

Get Your SunnyvaleProject Quote.

Tell us about your Sunnyvale home and what you’d like to build. We’ll reach out within one business day.
GET FREE ESTIMATE

Let's Discuss
Your Project Goals.

Planning a project in Sunnyvale? Tell us about your property and choose your project type. We’ll review your ideas and follow up within one business day to schedule a free consultation.

Select Your Project Type: