Campbell lots tend to be modest, so good design matters: a well-placed backyard ADU, an efficient garage conversion or a single-story rear addition can add a lot of living space without overwhelming the yard. Homes near downtown can fall within the historic district, where exterior changes get extra review, and the San Tomas area has its own neighborhood plan with design standards. We work through the City of Campbell’s requirements so your project is approved the first time.
You’ll get a fixed construction price and one project manager from start to finish.
We handle every permit. Here's the short version of what Campbell typically requires for common projects:
Detached, attached and garage ADUs for rental income or extended family.
Turn an existing garage into a legal ADU, in-law suite or home office.
Add a private suite of up to 500 sq ft inside the home you already own.
From quick refreshes to fully custom estate kitchens.
Walk-in showers, primary suites and accessible bathrooms.
Bedrooms, primary suites and guest houses that match your home.
Whole-house renovations planned from 4–5 months to 12+ months.
One team for design, city approvals and construction.
Every project gets a fixed construction price after a free site visit.
Often, yes. With the 4-foot setbacks state law allows, many Campbell lots fit a 500–800 sq ft detached ADU or a garage conversion. We confirm fit with a site review.
What you're building matters most: an office or bonus room without a kitchen costs far less than a legal studio or one-bedroom ADU. Slab condition, distance to the sewer line, electrical panel capacity and finish level also affect the price. We give you a fixed price after a free site visit.
Yes. Older bungalows often need foundation, electrical and plumbing upgrades, and we plan those along with the design details that give the home its character.
Simple remodel permits can be issued in days to a few weeks; additions and ADUs usually take 2–4 months including plan check.
Scope is the biggest factor. A same-layout refresh, a signature remodel with semi-custom cabinetry and layout changes, and an estate-level custom kitchen are very different projects. Moving plumbing, gas lines or walls, cabinetry and countertop selections, appliances and city permit fees also play a role. We give you a fixed price after a free site visit.
Plans and permits typically take 8–14 weeks, and construction of a detached ADU usually takes 16–22 weeks once permits are issued, so most detached ADUs are finished in about 6–9 months. Garage conversions and JADUs are usually faster.