Campbell’s Neighborhood Design-Build Contractor.

Campbell’s walkable neighborhoods mix early 20th-century bungalows near downtown with post-war ranch homes in the San Tomas area. True Builders designs, permits and builds remodels, additions and ADUs across the city. Licensed (CSLB #1110631) and insured.
Craftsman bungalow with a deep front porch in Campbell
Local Knowledge, Local Results

Why Campbell HomeownersChoose True Builders.

Campbell lots tend to be modest, so good design matters: a well-placed backyard ADU, an efficient garage conversion or a single-story rear addition can add a lot of living space without overwhelming the yard. Homes near downtown can fall within the historic district, where exterior changes get extra review, and the San Tomas area has its own neighborhood plan with design standards. We work through the City of Campbell’s requirements so your project is approved the first time.

You’ll get a fixed construction price and one project manager from start to finish.

Detached backyard cottage ADU with a wood deck
Recent Work

Projects Like Yours.

Campbell Permits & Rules

What to Know Before You Build in Campbell.

We handle every permit. Here's the short version of what Campbell typically requires for common projects:

  • Historic district — Exterior changes to properties in Campbell's downtown historic district typically require historic preservation review.
  • San Tomas area — Additions and new homes in the San Tomas neighborhood are reviewed against its area plan and design standards.
  • ADUs — Approved ministerially under California ADU law; detached ADUs need only 4-foot side and rear setbacks.
  • Remodels — Permits are required when plumbing, electrical or structural elements change.
  • Trees — Protected trees require a permit to remove, so we identify them before designing additions or ADUs.
SERVICES IN CAMPBELL

Everything Your Campbell Home Needs.

From ADUs and garage conversions to kitchens, bathrooms and additions, one licensed team handles design, permits and construction for Campbell homeowners.

Typical Campbell Project Timelines

  • Detached ADU: typically finished in 6–9 months
  • Room addition: 3–4 months of construction for one room, 4–6 months for a primary suite
  • Whole-home remodel: 4–5 months for select spaces up to 8–12+ months for a full redesign

Every project gets a fixed construction price after a free site visit.

How a Campbell Project Works

  1. Free consultation & site visitWe review your goals, your lot and Campbell zoning rules before anything is designed.
  2. Design & fixed pricePlans, engineering and a clear, fixed construction price before work begins.
  3. PermitsWe submit to the City of Campbell and handle every plan-check comment for you.
  4. Build & final inspectionOne project manager from the first day on site through final sign-off.

Also Serving Homeowners Near Campbell

CAMPBELL FAQS

Local Questions, Answered.

Often, yes. With the 4-foot setbacks state law allows, many Campbell lots fit a 500–800 sq ft detached ADU or a garage conversion. We confirm fit with a site review.

What you're building matters most: an office or bonus room without a kitchen costs far less than a legal studio or one-bedroom ADU. Slab condition, distance to the sewer line, electrical panel capacity and finish level also affect the price. We give you a fixed price after a free site visit.

Yes. Older bungalows often need foundation, electrical and plumbing upgrades, and we plan those along with the design details that give the home its character.

Simple remodel permits can be issued in days to a few weeks; additions and ADUs usually take 2–4 months including plan check.

Scope is the biggest factor. A same-layout refresh, a signature remodel with semi-custom cabinetry and layout changes, and an estate-level custom kitchen are very different projects. Moving plumbing, gas lines or walls, cabinetry and countertop selections, appliances and city permit fees also play a role. We give you a fixed price after a free site visit.

Plans and permits typically take 8–14 weeks, and construction of a detached ADU usually takes 16–22 weeks once permits are issued, so most detached ADUs are finished in about 6–9 months. Garage conversions and JADUs are usually faster.

Ready to Start?

Get Your CampbellProject Quote.

Tell us about your Campbell home and what you’d like to build. We’ll reach out within one business day.
GET FREE ESTIMATE