San José’s housing stock is largely post-war ranch homes on generous lots, which makes it one of the best cities in the Bay Area for backyard ADUs and garage conversions. We plan around what the city’s Planning, Building and Code Enforcement department actually checks: sewer lateral capacity, setbacks, ordinance-size trees and, in older neighborhoods like Naglee Park and Hanchett & Hester Park, conservation-area design review.
Every project includes a fixed construction price and one project manager who stays with you from design through final sign-off.
What to Know Before You Build in San Jose.
We handle every permit. Here's the short version of what San Jose typically requires for common projects:
- ADUs: Reviewed ministerially under California ADU law, with no public hearing. San José also offers pre-approved ADU plans that can shorten plan check when a standard design fits your lot.
- Kitchen & bath remodels: Building, plumbing and electrical permits are needed when walls move or plumbing and circuits change. Many smaller residential permits can be issued quickly.
- Additions & second stories: Must meet single-family zoning setbacks and height limits; larger additions can need planning review, especially in conservation areas.
- Trees: Removing an ordinance-size tree on private property requires a tree removal permit, so we map trees before placing an ADU or addition.
- Hillside lots: Homes in the Almaden and Evergreen foothills can require geotechnical reports and added grading review.
Everything Your San Jose Home Needs.
ADU Builder
Detached, attached and garage ADUs for rental income or extended family.
Garage Conversion
Turn an existing garage into a legal ADU, in-law suite or home office.
Junior ADU (JADU)
Add a private suite of up to 500 sq ft inside the home you already own.
Kitchen Remodeling
From quick refreshes to fully custom estate kitchens.
Bathroom Remodeling
Walk-in showers, primary suites and accessible bathrooms.
Room Additions
Bedrooms, primary suites and guest houses that match your home.
Full Home Remodeling
Whole-house renovations planned from 4-5 months to 12+ months.
Permits & Design-Build
One team for design, city approvals and construction.
Typical San Jose Project Timelines
- Detached ADU: typically finished in 6-9 months
- Room addition: 3-4 months of construction for one room, 4-6 months for a primary suite
- Whole-home remodel: 4-5 months for select spaces up to 8-12+ months for a full redesign
Every project gets a fixed construction price after a free site visit.
How a San Jose Project Works
- Free consultation & site visitWe review your goals, your lot and San Jose zoning rules before anything is designed.
- Design & fixed pricePlans, engineering and a clear, fixed construction price before work begins.
- PermitsWe submit to the City of San Jose and handle every plan-check comment for you.
- Build & final inspectionOne project manager from the first day on site through final sign-off.
Also Serving Homeowners Near San Jose
Local Questions, Answered.
The type of ADU matters most: converting a garage usually costs far less than building a new detached unit. After that, size, utility trenching and the sewer connection, foundation and soil conditions, and finish level drive the price. We give you a fixed price after a free site visit.
Simple remodel permits can be issued within days to a few weeks. ADUs and additions typically take 2-4 months including plan-check revisions, and state law requires a decision on a complete ADU application within 60 days.
Yes. State law allows a single-family lot to have both an ADU and a Junior ADU, so many San José owners pair a backyard unit with a JADU inside the main house.
We work citywide, including Willow Glen, Rose Garden, Cambrian, Almaden Valley, Evergreen, Berryessa, West San José and Blossom Valley.
Scope is the biggest factor. A same-layout refresh, a signature remodel with semi-custom cabinetry and layout changes, and an estate-level custom kitchen are very different projects. Moving plumbing, gas lines or walls, cabinetry and countertop selections, appliances and city permit fees also play a role. We give you a fixed price after a free site visit.
Plans and permits typically take 8-14 weeks, and construction of a detached ADU usually takes 16-22 weeks once permits are issued, so most detached ADUs are finished in about 6-9 months. Garage conversions and JADUs are usually faster.
It depends on scope: remodeling select spaces such as the kitchen and bathrooms takes about 4-5 months, a comprehensive remodel with structural changes 6-8 months, and a complete home redesign 8-12 months or more.