Building in Los Gatos means working with the Town’s architecture and site review for many exterior changes, its Hillside Development Standards and Guidelines on sloped lots, and historic district review in neighborhoods like Almond Grove and Broadway. Hillside projects can also involve geotechnical reports, drainage plans and fire-resistant construction. We factor those steps into design and schedule from day one, so there are no surprises after you’ve committed.
Every project includes a fixed construction price and one project manager.
We handle every permit. Here's the short version of what Los Gatos typically requires for common projects:
Detached, attached and garage ADUs for rental income or extended family.
Turn an existing garage into a legal ADU, in-law suite or home office.
Add a private suite of up to 500 sq ft inside the home you already own.
From refreshes to estate kitchens, typically $60K to $250K+.
Walk-in showers, primary suites and accessible bathrooms.
Bedrooms, primary suites and guest houses that match your home.
Whole-house renovations planned from 4–5 months to 12+ months.
One team for design, city approvals and construction.
2026 ranges for planning purposes. Your fixed price follows a site visit.
Interior remodels usually need only building permits. Many exterior changes, additions and new homes go through the Town's architecture and site review, and historic properties get additional review.
It takes more planning. Expect a geotechnical report, grading and drainage plans, and fire-resistant construction in many areas, which adds time and cost we include in our estimate.
Typical 2026 ranges are $35,000–$60,000 for a refresh, $60,000–$100,000 for a full remodel and $100,000 or more for a primary suite.
Yes. State law allows ADUs on single-family lots in Los Gatos, including hillside properties, though slope, fire access and utilities can affect design and cost.
Most Los Gatos kitchen remodels fall into three levels: about $60,000–$95,000 for a refresh, $95,000–$150,000 for a signature remodel with semi-custom cabinetry and layout changes, and $150,000–$250,000 or more for an estate-level custom kitchen, plus city permit fees.
Plans and permits typically take 8–14 weeks, and construction of a detached ADU usually takes 16–22 weeks once permits are issued, so most detached ADUs are finished in about 6–9 months. Garage conversions and JADUs are usually faster.
Planning a project in Los Gatos? Tell us about your property and choose your project type. We’ll review your ideas and follow up within one business day to schedule a free consultation.