Multigenerational Remodels & ADUs in Milpitas.

Many Milpitas families are making room for parents, grandparents and adult children. True Builders designs, permits and builds ADUs, Junior ADUs, additions and remodels that give every generation its own space. Licensed (CSLB #1110631) and insured.
Refreshed two-story tract home in Milpitas
Local Knowledge, Local Results

Why Milpitas HomeownersChoose True Builders.

Milpitas has established single-family neighborhoods west of I-680 and hillside areas to the east. Two-story tract homes often have room for a Junior ADU in an attached garage or ground-floor wing, while larger lots can take a detached ADU. Hillside properties can involve additional grading and geologic review, and some newer neighborhoods add HOA approval to the process. We work with the City of Milpitas so your project is designed to be approved.

Every project includes a fixed construction price and one project manager.

In-law suite bedroom with an efficiency kitchenette
Recent Work

Projects Like Yours.

Milpitas Permits & Rules

What to Know Before You Build in Milpitas.

We handle every permit. Here's the short version of what Milpitas typically requires for common projects:

  • ADUs & JADUs — Approved ministerially under state law. A single-family lot can have both an ADU and a Junior ADU.
  • Hillside areas — Properties in the eastern foothills can require geotechnical reports and added grading and drainage review.
  • Additions — Must meet zoning setbacks, height and lot coverage limits for your district.
  • Remodels — Building, plumbing and electrical permits are needed when layouts, drains or circuits change.
  • HOA communities — Some Milpitas neighborhoods require HOA architectural approval in addition to city permits; we help prepare those submittals.
SERVICES IN MILPITAS

Everything Your Milpitas Home Needs.

From ADUs and garage conversions to kitchens, bathrooms and additions, one licensed team handles design, permits and construction for Milpitas homeowners.

Typical Milpitas Project Costs & Timelines

  • Kitchen remodel: about $60K–$95K for a refresh, $95K–$150K for a signature remodel, $150K–$250K+ for an estate kitchen
  • Bathroom remodel: about $35K–$60K for a refresh up to $100K–$175K+ for a primary suite
  • Garage conversion to an ADU: about $120K–$275K
  • Detached ADU: about $275K–$600K+, typically finished in 6–9 months
  • Room addition: 3–4 months of construction for one room, 4–6 months for a primary suite
  • Whole-home remodel: 4–5 months for select spaces up to 8–12+ months for a full redesign

2026 ranges for planning purposes. Your fixed price follows a site visit.

How a Milpitas Project Works

  1. Free consultation & site visitWe review your goals, your lot and Milpitas zoning rules before anything is designed.
  2. Design & fixed pricePlans, engineering and a clear, fixed construction price before work begins.
  3. PermitsWe submit to the City of Milpitas and handle every plan-check comment for you.
  4. Build & final inspectionOne project manager from the first day on site through final sign-off.

Also Serving Homeowners Near Milpitas

MILPITAS FAQS

Local Questions, Answered.

It depends on your lot and budget. A Junior ADU inside the home is usually fastest and least expensive, a garage conversion creates a separate unit, and a detached ADU offers the most privacy. We compare options during a site visit.

Most JADUs cost about $55,000–$95,000 when converting a bedroom with a shared bath, and up to about $190,000 with a private bath or an attached-garage conversion.

If your home is in an HOA community, exterior changes and ADUs may need HOA architectural approval. California limits how far HOAs can restrict ADUs, but their approval process still applies.

Construction for a single-room addition typically takes 3–4 months, and a primary suite addition 4–6 months, plus time up front for design, engineering and permits.

Most Milpitas kitchen remodels fall into three levels: about $60,000–$95,000 for a refresh, $95,000–$150,000 for a signature remodel with semi-custom cabinetry and layout changes, and $150,000–$250,000 or more for an estate-level custom kitchen, plus city permit fees.

Plans and permits typically take 8–14 weeks, and construction of a detached ADU usually takes 16–22 weeks once permits are issued, so most detached ADUs are finished in about 6–9 months. Garage conversions and JADUs are usually faster.

Ready to Start?

Get Your MilpitasProject Quote.

Tell us about your Milpitas home and what you’d like to build. We’ll reach out within one business day.
GET FREE ESTIMATE

Let's Discuss
Your Project Goals.

Planning a project in Milpitas? Tell us about your property and choose your project type. We’ll review your ideas and follow up within one business day to schedule a free consultation.

Select Your Project Type: